S Tiburcio Ave over Grant Canal
FairPosted for loadFresno County, California · 0.18 MI S/O Mt Whitney Av · Structure no. 42C0515
- Built
- 1937
- 88 years old
- Condition
- Fair
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 41 ft
- 2 main spans
- Daily traffic
- 210
- 2010 count
- Owner
- County
- County Highway Agency
About this bridge
S Tiburcio Ave over Grant Canal is a wood or timber stringer/multi-beam or girder carrying S Tiburcio Ave over Grant Canal in Fresno County, California. It was built in 1937, so it is 88 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 210 vehicles a day, roughly 5% of them trucks, projected to reach 352 by 2042. The structure is 41 ft (12.5 m) long and 24 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S Tiburcio Ave over Grant Canal built?
It was built in 1937, making it 88 years old in 2025.
What condition is S Tiburcio Ave over Grant Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does S Tiburcio Ave over Grant Canal carry?
About 210 vehicles per day (2010 count), of which roughly 5% are trucks.
How long is S Tiburcio Ave over Grant Canal?
The structure is 41 ft (12.5 m) long with a longest span of 20 ft (6.1 m) and a deck 24 ft wide.
Who owns S Tiburcio Ave over Grant Canal?
It is owned by the County Highway Agency.