E Edgar Ave over Friant-Kern Canal
FairFresno County, California · 0.45 MI E/O Navelencia Av · Structure no. 42C0286
- Built
- 1955
- 70 years old
- Condition
- Fair
- inspected December 2024
- Type
- Tee Beam
- Concrete Continuous
- Length
- 125 ft
- 4 main spans
- Daily traffic
- 200
- 2010 count
- Owner
- County
- County Highway Agency
About this bridge
E Edgar Ave over Friant-Kern Canal is a concrete continuous tee beam carrying E Edgar Ave over Friant-Kern Canal in Fresno County, California. It was built in 1955, so it is 70 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 200 vehicles a day, roughly 5% of them trucks, projected to reach 367 by 2044. The structure is 125 ft (38.1 m) long and 28 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E Edgar Ave over Friant-Kern Canal built?
It was built in 1955, making it 70 years old in 2025.
What condition is E Edgar Ave over Friant-Kern Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does E Edgar Ave over Friant-Kern Canal carry?
About 200 vehicles per day (2010 count), of which roughly 5% are trucks.
How long is E Edgar Ave over Friant-Kern Canal?
The structure is 125 ft (38.1 m) long with a longest span of 32 ft (9.8 m) and a deck 28 ft wide.
Who owns E Edgar Ave over Friant-Kern Canal?
It is owned by the County Highway Agency.