Piedra RD over Alta Main Canal
FairFresno County, California · 1.71 MI S Weldon Ave · Structure no. 42C0068
- Built
- 1965
- 60 years old
- Condition
- Fair
- inspected December 2024
- Type
- Slab
- Concrete Continuous
- Length
- 121 ft
- 4 main spans
- Daily traffic
- 1,700
- 2010 count
- Owner
- County
- County Highway Agency
About this bridge
Piedra RD over Alta Main Canal is a concrete continuous slab carrying Piedra RD over Alta Main Canal in Fresno County, California. It was built in 1965, so it is 60 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,700 vehicles a day, roughly 3% of them trucks, projected to reach 3,247 by 2043. The structure is 121 ft (36.9 m) long and 33 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Piedra RD over Alta Main Canal built?
It was built in 1965, making it 60 years old in 2025.
What condition is Piedra RD over Alta Main Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does Piedra RD over Alta Main Canal carry?
About 1,700 vehicles per day (2010 count), of which roughly 3% are trucks.
How long is Piedra RD over Alta Main Canal?
The structure is 121 ft (36.9 m) long with a longest span of 30 ft (9.1 m) and a deck 33 ft wide.
Who owns Piedra RD over Alta Main Canal?
It is owned by the County Highway Agency.