US Bridges

State Route 180 over Future Rail Tracks Chsra

Good

Fresno County, California · 06-FRE-180-R56.77 · Structure no. 42 0461

Built
2020
5 years old
Condition
Good
inspected November 2023
Type
Frame
Concrete
Length
52 ft
1 main span
Daily traffic
108,000
2019 count
Owner
State
Other State Agency

About this bridge

State Route 180 over Future Rail Tracks Chsra is a concrete frame carrying State Route 180 over Future Rail Tracks Chsra in Fresno County, California. It was built in 2020, so it is 5 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 108,000 vehicles a day, roughly 6% of them trucks, projected to reach 140,000 by 2043. The structure is 52 ft (15.8 m) long. If it were closed, the detour would be 0.6 mi (1 km).

CarriesState Route 180
CrossesFuture Rail Tracks Chsra
Location06-FRE-180-R56.77
RouteState Highway 180
Coordinates36.74419, -119.80742
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.5 US tons
Inventory rating35.7 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckNot applicable
Main spans1
Design loadUnknown
Structure length52 ft (15.8 m)
Longest span47 ft (14.2 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic108,000 (2019)
Projected traffic140,000 by 2043
Trucks6%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway
CrossesOther
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerOther State Agency
Maintained byOther State Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was State Route 180 over Future Rail Tracks Chsra built?

It was built in 2020, making it 5 years old in 2025.

What condition is State Route 180 over Future Rail Tracks Chsra in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does State Route 180 over Future Rail Tracks Chsra carry?

About 108,000 vehicles per day (2019 count), of which roughly 6% are trucks.

How long is State Route 180 over Future Rail Tracks Chsra?

The structure is 52 ft (15.8 m) long with a longest span of 47 ft (14.2 m).

Who owns State Route 180 over Future Rail Tracks Chsra?

It is owned by the Other State Agency.