US Bridges

Clinton Ave over State Route 99

Good

Fresno County, California · 06-FRE-099-24.41-FRE · Structure no. 42 0448

Built
2018
7 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
215 ft
2 main spans
Daily traffic
15,275
2020 count
Owner
State
State Park, Forest, or Reservation Agency

About this bridge

Clinton Ave over State Route 99 is a prestressed concrete stringer/multi-beam or girder carrying Clinton Ave over State Route 99 in Fresno County, California. It was built in 2018, so it is 7 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 15,275 vehicles a day, roughly 10% of them trucks, projected to reach 18,000 by 2040. The structure is 215 ft (65.6 m) long and 118 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesClinton Ave
CrossesState Route 99
Location06-FRE-099-24.41-FRE
RouteCity Street 0
Coordinates36.77178, -119.83939
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadGreater than HL 93
Structure length215 ft (65.6 m)
Longest span125 ft (38.1 m)
Deck width118 ft (36.1 m)
Roadway width104 ft (31.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15,275 (2020)
Projected traffic18,000 by 2040
Trucks10%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Park, Forest, or Reservation Agency
Maintained byState Park, Forest, or Reservation Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Clinton Ave over State Route 99 built?

It was built in 2018, making it 7 years old in 2025.

What condition is Clinton Ave over State Route 99 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Clinton Ave over State Route 99 carry?

About 15,275 vehicles per day (2020 count), of which roughly 10% are trucks.

How long is Clinton Ave over State Route 99?

The structure is 215 ft (65.6 m) long with a longest span of 125 ft (38.1 m) and a deck 118 ft wide.

Who owns Clinton Ave over State Route 99?

It is owned by the State Park, Forest, or Reservation Agency.