US Bridges

E&W180-N41 Connctr over Olive Ave

Good

Fresno County, California · 06-FRE-180-R58.76-FRE · Structure no. 42 0291H

Built
1982
43 years old, rebuilt 1999
Condition
Good
inspected January 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
126 ft
1 main span
Daily traffic
25,000
2019 count
Owner
State
State Highway Agency

About this bridge

E&W180-N41 Connctr over Olive Ave is a prestressed concrete box beam or girders - multiple carrying E&W180-N41 Connctr over Olive Ave in Fresno County, California. It was built in 1982 and reconstructed in 1999, so it is 43 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 25,000 vehicles a day, roughly 2% of them trucks, projected to reach 36,547 by 2042. The structure is 126 ft (38.4 m) long and 63 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesE&W180-N41 Connctr
CrossesOlive Ave
Location06-FRE-180-R58.76-FRE
RouteState Highway 180
Coordinates36.75755, -119.77505
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length126 ft (38.4 m)
Longest span123 ft (37.6 m)
Deck width63 ft (19.2 m)
Roadway width59 ft (18.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25,000 (2019)
Projected traffic36,547 by 2042
Trucks2%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was E&W180-N41 Connctr over Olive Ave built?

It was built in 1982, making it 43 years old in 2025. It was reconstructed in 1999.

What condition is E&W180-N41 Connctr over Olive Ave in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does E&W180-N41 Connctr over Olive Ave carry?

About 25,000 vehicles per day (2019 count), of which roughly 2% are trucks.

How long is E&W180-N41 Connctr over Olive Ave?

The structure is 126 ft (38.4 m) long with a longest span of 123 ft (37.6 m) and a deck 63 ft wide.

Who owns E&W180-N41 Connctr over Olive Ave?

It is owned by the State Highway Agency.