E&W180-N41 Connctr over Olive Ave
GoodFresno County, California · 06-FRE-180-R58.76-FRE · Structure no. 42 0291H
- Built
- 1982
- 43 years old, rebuilt 1999
- Condition
- Good
- inspected January 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 126 ft
- 1 main span
- Daily traffic
- 25,000
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
E&W180-N41 Connctr over Olive Ave is a prestressed concrete box beam or girders - multiple carrying E&W180-N41 Connctr over Olive Ave in Fresno County, California. It was built in 1982 and reconstructed in 1999, so it is 43 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 25,000 vehicles a day, roughly 2% of them trucks, projected to reach 36,547 by 2042. The structure is 126 ft (38.4 m) long and 63 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E&W180-N41 Connctr over Olive Ave built?
It was built in 1982, making it 43 years old in 2025. It was reconstructed in 1999.
What condition is E&W180-N41 Connctr over Olive Ave in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does E&W180-N41 Connctr over Olive Ave carry?
About 25,000 vehicles per day (2019 count), of which roughly 2% are trucks.
How long is E&W180-N41 Connctr over Olive Ave?
The structure is 126 ft (38.4 m) long with a longest span of 123 ft (37.6 m) and a deck 63 ft wide.
Who owns E&W180-N41 Connctr over Olive Ave?
It is owned by the State Highway Agency.