Mount Aukum Road over North Fk Cosumnes River
GoodEl Dorado County, California · 2.6 MI S Pleasant Valy RD · Structure no. 25C0016
- Built
- 1960
- 65 years old
- Condition
- Good
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 259 ft
- 3 main spans
- Daily traffic
- 1,746
- 2012 count
- Owner
- County
- County Highway Agency
About this bridge
Mount Aukum Road over North Fk Cosumnes River is a steel stringer/multi-beam or girder carrying Mount Aukum Road over North Fk Cosumnes River in El Dorado County, California. It was built in 1960, so it is 65 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,746 vehicles a day, roughly 10% of them trucks, projected to reach 4,436 by 2043. The structure is 259 ft (78.9 m) long and 32 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Mount Aukum Road over North Fk Cosumnes River built?
It was built in 1960, making it 65 years old in 2025.
What condition is Mount Aukum Road over North Fk Cosumnes River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does Mount Aukum Road over North Fk Cosumnes River carry?
About 1,746 vehicles per day (2012 count), of which roughly 10% are trucks.
How long is Mount Aukum Road over North Fk Cosumnes River?
The structure is 259 ft (78.9 m) long with a longest span of 85 ft (25.9 m) and a deck 32 ft wide.
Who owns Mount Aukum Road over North Fk Cosumnes River?
It is owned by the County Highway Agency.