US Bridges

No Data Entered over Tallac Creek

Good

El Dorado County, California · No Data Entered · Structure no. 051900000011047

Built
2009
16 years old
Condition
Good
inspected July 2023
Type
Slab
Prestressed Concrete
Length
40 ft
1 main span
Daily traffic
50
Owner
Federal
U.S. Forest Service

About this bridge

No Data Entered over Tallac Creek is a prestressed concrete slab carrying No Data Entered over Tallac Creek in El Dorado County, California. It was built in 2009, so it is 16 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 75 by 2045. The structure is 40 ft (12.2 m) long and 20 ft wide. If it were closed, the detour would be 620.7 mi (999 km).

CarriesNo Data Entered
CrossesTallac Creek
LocationNo Data Entered
RouteFederal Lands Road 1307
Coordinates38.9301, -120.08026
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating46.7 US tons
Inventory rating36 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHS 20
Structure length40 ft (12.2 m)
Longest span39 ft (11.8 m)
Deck width20 ft (6.1 m)
Roadway width18 ft (5.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (—)
Projected traffic75 by 2045
Trucks—
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed620.7 mi (999 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was No Data Entered over Tallac Creek built?

It was built in 2009, making it 16 years old in 2025.

What condition is No Data Entered over Tallac Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does No Data Entered over Tallac Creek carry?

About 50 vehicles per day (latest count).

How long is No Data Entered over Tallac Creek?

The structure is 40 ft (12.2 m) long with a longest span of 39 ft (11.8 m) and a deck 20 ft wide.

Who owns No Data Entered over Tallac Creek?

It is owned by the U.S. Forest Service.