US Bridges

No Data Entered over No Data Entered

Good

El Dorado County, California · No Data Entered · Structure no. 051900000003017

Built
2004
21 years old
Condition
Good
inspected July 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
150 ft
3 main spans
Daily traffic
50
Owner
Federal
U.S. Forest Service

About this bridge

No Data Entered over No Data Entered is a prestressed concrete box beam or girders - multiple carrying No Data Entered over No Data Entered in El Dorado County, California. It was built in 2004, so it is 21 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 75 by 2045. The structure is 150 ft (45.7 m) long and 24 ft wide. If it were closed, the detour would be 620.7 mi (999 km).

CarriesNo Data Entered
CrossesNo Data Entered
LocationNo Data Entered
RouteFederal Lands Road 3
Coordinates39.10534, -120.19643
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating69.7 US tons
Inventory rating46.1 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans3
Design loadHS 20
Structure length150 ft (45.7 m)
Longest span60 ft (18.3 m)
Deck width24 ft (7.3 m)
Roadway width23 ft (7.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (—)
Projected traffic75 by 2045
Trucks—
Lanes on structure2
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed620.7 mi (999 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was No Data Entered over No Data Entered built?

It was built in 2004, making it 21 years old in 2025.

What condition is No Data Entered over No Data Entered in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does No Data Entered over No Data Entered carry?

About 50 vehicles per day (latest count).

How long is No Data Entered over No Data Entered?

The structure is 150 ft (45.7 m) long with a longest span of 60 ft (18.3 m) and a deck 24 ft wide.

Who owns No Data Entered over No Data Entered?

It is owned by the U.S. Forest Service.