US Bridges

Winding Road over Anderson Canyon

Fair

El Dorado County, California · No Data Entered · Structure no. 050351000001063

Built
1974
51 years old
Condition
Fair
inspected September 2023
Type
Stringer/Multi-beam or Girder
Wood or Timber
Length
50 ft
1 main span
Daily traffic
50
Owner
Federal
U.S. Forest Service

About this bridge

Winding Road over Anderson Canyon is a wood or timber stringer/multi-beam or girder carrying Winding Road over Anderson Canyon in El Dorado County, California. It was built in 1974, so it is 51 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 50 vehicles a day, projected to reach 75 by 2045. The structure is 50 ft (15.2 m) long and 15 ft wide.

CarriesWinding Road
CrossesAnderson Canyon
LocationNo Data Entered
RouteFederal Lands Road 9N42
Coordinates38.60091, -120.27647
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating38.3 US tons
Inventory rating29.7 US tons

Structure

MaterialWood or Timber
DeckWood or timber
Main spans1
Design loadH 20
Structure length50 ft (15.2 m)
Longest span50 ft (15.2 m)
Deck width15 ft (4.6 m)
Roadway width14 ft (4.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (—)
Projected traffic75 by 2045
Trucks—
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Winding Road over Anderson Canyon built?

It was built in 1974, making it 51 years old in 2025.

What condition is Winding Road over Anderson Canyon in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does Winding Road over Anderson Canyon carry?

About 50 vehicles per day (latest count).

How long is Winding Road over Anderson Canyon?

The structure is 50 ft (15.2 m) long with a longest span of 50 ft (15.2 m) and a deck 15 ft wide.

Who owns Winding Road over Anderson Canyon?

It is owned by the U.S. Forest Service.