US Bridges

U.S. Highway 101 over Hunter Creek

Good

Del Norte County, California · 01-DN-101-8.51 · Structure no. 01 0086

Built
2023
2 years old
Condition
Good
inspected August 2023
Type
Slab
Prestressed Concrete Continuous
Length
133 ft
2 main spans
Daily traffic
4,900
2019 count
Owner
State
State Highway Agency

About this bridge

U.S. Highway 101 over Hunter Creek is a prestressed concrete continuous slab carrying U.S. Highway 101 over Hunter Creek in Del Norte County, California. It was built in 2023, so it is 2 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,900 vehicles a day, roughly 14% of them trucks, projected to reach 6,400 by 2043. The structure is 133 ft (40.5 m) long and 51 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesU.S. Highway 101
CrossesHunter Creek
Location01-DN-101-8.51
RouteU.S. Route 101
Coordinates41.55814, -124.05888
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length133 ft (40.5 m)
Longest span61 ft (18.7 m)
Deck width51 ft (15.5 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,900 (2019)
Projected traffic6,400 by 2043
Trucks14%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was U.S. Highway 101 over Hunter Creek built?

It was built in 2023, making it 2 years old in 2025.

What condition is U.S. Highway 101 over Hunter Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does U.S. Highway 101 over Hunter Creek carry?

About 4,900 vehicles per day (2019 count), of which roughly 14% are trucks.

How long is U.S. Highway 101 over Hunter Creek?

The structure is 133 ft (40.5 m) long with a longest span of 61 ft (18.7 m) and a deck 51 ft wide.

Who owns U.S. Highway 101 over Hunter Creek?

It is owned by the State Highway Agency.