US Bridges

Rumrill Blvd over San Pablo Creek

Good

Contra Costa County, California · At Brookside DR · Structure no. 28C0490

Built
2012
13 years old
Condition
Good
inspected December 2024
Type
Box Beam or Girders - Multiple
Concrete
Length
62 ft
1 main span
Daily traffic
18,800
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Rumrill Blvd over San Pablo Creek is a concrete box beam or girders - multiple carrying Rumrill Blvd over San Pablo Creek in Contra Costa County, California. It was built in 2012, so it is 13 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 18,800 vehicles a day, roughly 6% of them trucks, projected to reach 28,444 by 2041. The structure is 62 ft (18.9 m) long and 84 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesRumrill Blvd
CrossesSan Pablo Creek
LocationAt Brookside DR
RouteCity Street 0
Coordinates37.96392, -122.35468
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating43.2 US tons
Inventory rating33.2 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length62 ft (18.9 m)
Longest span58 ft (17.7 m)
Deck width84 ft (25.6 m)
Roadway width70 ft (21.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,800 (2020)
Projected traffic28,444 by 2041
Trucks6%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Rumrill Blvd over San Pablo Creek built?

It was built in 2012, making it 13 years old in 2025.

What condition is Rumrill Blvd over San Pablo Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does Rumrill Blvd over San Pablo Creek carry?

About 18,800 vehicles per day (2020 count), of which roughly 6% are trucks.

How long is Rumrill Blvd over San Pablo Creek?

The structure is 62 ft (18.9 m) long with a longest span of 58 ft (17.7 m) and a deck 84 ft wide.

Who owns Rumrill Blvd over San Pablo Creek?

It is owned by the City or Municipal Highway Agency.