US Bridges

Treat Blvd over Pine Creek

Good

Contra Costa County, California · At San Miguel RD · Structure no. 28C0355

Built
1965
60 years old, rebuilt 1989
Condition
Good
inspected November 2023
Type
Culvert
Concrete Continuous
Length
36 ft
2 main spans
Daily traffic
18,245
2005 count
Owner
City
City or Municipal Highway Agency

About this bridge

Treat Blvd over Pine Creek is a concrete continuous culvert carrying Treat Blvd over Pine Creek in Contra Costa County, California. It was built in 1965 and reconstructed in 1989, so it is 60 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 18,245 vehicles a day, roughly 8% of them trucks, projected to reach 47,146 by 2040. The structure is 36 ft (11.1 m) long and 106 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesTreat Blvd
CrossesPine Creek
LocationAt San Miguel RD
RouteCity Street 0
Coordinates37.94551, -122.01454
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44.6 US tons
Inventory rating26.8 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans2
Design loadUnknown
Structure length36 ft (11.1 m)
Longest span24 ft (7.2 m)
Deck width106 ft (32.2 m)
Roadway width80 ft (24.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,245 (2005)
Projected traffic47,146 by 2040
Trucks8%
Lanes on structure7
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Treat Blvd over Pine Creek built?

It was built in 1965, making it 60 years old in 2025. It was reconstructed in 1989.

What condition is Treat Blvd over Pine Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Treat Blvd over Pine Creek carry?

About 18,245 vehicles per day (2005 count), of which roughly 8% are trucks.

How long is Treat Blvd over Pine Creek?

The structure is 36 ft (11.1 m) long with a longest span of 24 ft (7.2 m) and a deck 106 ft wide.

Who owns Treat Blvd over Pine Creek?

It is owned by the City or Municipal Highway Agency.