Miner RD over San Pablo Creek
FairContra Costa County, California · At Camino Pablo · Structure no. 28C0330
- Built
- 1931
- 94 years old
- Condition
- Fair
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 85 ft
- 3 main spans
- Daily traffic
- 6,368
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Miner RD over San Pablo Creek is a steel stringer/multi-beam or girder carrying Miner RD over San Pablo Creek in Contra Costa County, California. It was built in 1931, so it is 94 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,368 vehicles a day, roughly 1% of them trucks, projected to reach 9,878 by 2040. The structure is 85 ft (25.8 m) long and 21 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Miner RD over San Pablo Creek built?
It was built in 1931, making it 94 years old in 2025.
What condition is Miner RD over San Pablo Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does Miner RD over San Pablo Creek carry?
About 6,368 vehicles per day (2020 count), of which roughly 1% are trucks.
How long is Miner RD over San Pablo Creek?
The structure is 85 ft (25.8 m) long with a longest span of 39 ft (11.8 m) and a deck 21 ft wide.
Who owns Miner RD over San Pablo Creek?
It is owned by the City or Municipal Highway Agency.