Pinole Valley RD over Pinole Creek
FairContra Costa County, California · 0.3 MI South of I-80 · Structure no. 28C0134
- Built
- 1936
- 89 years old, rebuilt 1962
- Condition
- Fair
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 60 ft
- 3 main spans
- Daily traffic
- 14,000
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Pinole Valley RD over Pinole Creek is a steel continuous stringer/multi-beam or girder carrying Pinole Valley RD over Pinole Creek in Contra Costa County, California. It was built in 1936 and reconstructed in 1962, so it is 89 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 14,000 vehicles a day, roughly 6% of them trucks, projected to reach 33,040 by 2042. The structure is 60 ft (18.3 m) long and 74 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pinole Valley RD over Pinole Creek built?
It was built in 1936, making it 89 years old in 2025. It was reconstructed in 1962.
What condition is Pinole Valley RD over Pinole Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does Pinole Valley RD over Pinole Creek carry?
About 14,000 vehicles per day (2020 count), of which roughly 6% are trucks.
How long is Pinole Valley RD over Pinole Creek?
The structure is 60 ft (18.3 m) long with a longest span of 30 ft (9.1 m) and a deck 74 ft wide.
Who owns Pinole Valley RD over Pinole Creek?
It is owned by the City or Municipal Highway Agency.