Park & Ride Access over Pine Creek
FairContra Costa County, California · 04-CC-242-R0.85-CND · Structure no. 28 0165Y
- Built
- 1964
- 61 years old
- Condition
- Fair
- inspected January 2024
- Type
- Tee Beam
- Concrete
- Length
- 71 ft
- 1 main span
- Daily traffic
- 200
- 2009 count
- Owner
- State
- State Highway Agency
About this bridge
Park & Ride Access over Pine Creek is a concrete tee beam carrying Park & Ride Access over Pine Creek in Contra Costa County, California. It was built in 1964, so it is 61 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 200 vehicles a day, roughly 2% of them trucks, projected to reach 216 by 2044. The structure is 71 ft (21.6 m) long and 34 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Park & Ride Access over Pine Creek built?
It was built in 1964, making it 61 years old in 2025.
What condition is Park & Ride Access over Pine Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does Park & Ride Access over Pine Creek carry?
About 200 vehicles per day (2009 count), of which roughly 2% are trucks.
How long is Park & Ride Access over Pine Creek?
The structure is 71 ft (21.6 m) long with a longest span of 65 ft (19.8 m) and a deck 34 ft wide.
Who owns Park & Ride Access over Pine Creek?
It is owned by the State Highway Agency.