US Bridges

White Road over RD 108 10Q Canal

Good

Colusa County, California · 1.4 MI W/O SR 45/BROWNING · Structure no. 15C0191

Built
1926
99 years old
Condition
Good
inspected October 2023
Type
Culvert
Concrete Continuous
Length
23 ft
2 main spans
Daily traffic
59
2014 count
Owner
County
County Highway Agency

About this bridge

White Road over RD 108 10Q Canal is a concrete continuous culvert carrying White Road over RD 108 10Q Canal in Colusa County, California. It was built in 1926, so it is 99 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 59 vehicles a day, roughly 10% of them trucks, projected to reach 107 by 2042. The structure is 23 ft (7 m) long. If it were closed, the detour would be 9.3 mi (15 km).

CarriesWhite Road
CrossesRD 108 10Q Canal
Location1.4 MI W/O SR 45/BROWNING
RouteCounty Highway 0
Coordinates38.96888, -121.895
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection9 ExcellentNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating30 US tons
Inventory rating17.9 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans2
Design loadUnknown
Structure length23 ft (7 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic59 (2014)
Projected traffic107 by 2042
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed9.3 mi (15 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was White Road over RD 108 10Q Canal built?

It was built in 1926, making it 99 years old in 2025.

What condition is White Road over RD 108 10Q Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does White Road over RD 108 10Q Canal carry?

About 59 vehicles per day (2014 count), of which roughly 10% are trucks.

How long is White Road over RD 108 10Q Canal?

The structure is 23 ft (7 m) long with a longest span of 10 ft (3 m).

Who owns White Road over RD 108 10Q Canal?

It is owned by the County Highway Agency.