Midway Road over Butte Creek and Overflow
GoodButte County, California · South of White Drive · Structure no. 12C0434
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected May 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 1,406 ft
- 12 main spans
- Daily traffic
- 1,254
- 2017 count
- Owner
- County
- County Highway Agency
About this bridge
Midway Road over Butte Creek and Overflow is a prestressed concrete continuous box beam or girders - multiple carrying Midway Road over Butte Creek and Overflow in Butte County, California. It was built in 2022, so it is 3 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,254 vehicles a day, roughly 14% of them trucks, projected to reach 1,336 by 2041. The structure is 1,406 ft (428.5 m) long and 41 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Midway Road over Butte Creek and Overflow built?
It was built in 2022, making it 3 years old in 2025.
What condition is Midway Road over Butte Creek and Overflow in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does Midway Road over Butte Creek and Overflow carry?
About 1,254 vehicles per day (2017 count), of which roughly 14% are trucks.
How long is Midway Road over Butte Creek and Overflow?
The structure is 1,406 ft (428.5 m) long with a longest span of 124 ft (37.8 m) and a deck 41 ft wide.
Who owns Midway Road over Butte Creek and Overflow?
It is owned by the County Highway Agency.