Farris RD over Main Drainage Canal
FairButte County, California · 2.5 MI W of Biggs-Grid RD · Structure no. 12C0386
- Built
- 1940
- 85 years old
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 24 ft
- 2 main spans
- Daily traffic
- 280
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
Farris RD over Main Drainage Canal is a steel stringer/multi-beam or girder carrying Farris RD over Main Drainage Canal in Butte County, California. It was built in 1940, so it is 85 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 280 vehicles a day, roughly 7% of them trucks, projected to reach 366 by 2044. The structure is 24 ft (7.3 m) long and 28 ft wide. If it were closed, the detour would be 14.3 mi (23 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Farris RD over Main Drainage Canal built?
It was built in 1940, making it 85 years old in 2025.
What condition is Farris RD over Main Drainage Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Farris RD over Main Drainage Canal carry?
About 280 vehicles per day (2019 count), of which roughly 7% are trucks.
How long is Farris RD over Main Drainage Canal?
The structure is 24 ft (7.3 m) long with a longest span of 11 ft (3.4 m) and a deck 28 ft wide.
Who owns Farris RD over Main Drainage Canal?
It is owned by the County Highway Agency.