Manzanita Ave over Lindo Channel
FairButte County, California · Btw East Ave & Hooker Oak · Structure no. 12C0275
- Built
- 1968
- 57 years old, rebuilt 2009
- Condition
- Fair
- inspected October 2024
- Type
- Slab
- Concrete Continuous
- Length
- 129 ft
- 5 main spans
- Daily traffic
- 11,900
- 2018 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Manzanita Ave over Lindo Channel is a concrete continuous slab carrying Manzanita Ave over Lindo Channel in Butte County, California. It was built in 1968 and reconstructed in 2009, so it is 57 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 11,900 vehicles a day, roughly 5% of them trucks, projected to reach 14,619 by 2042. The structure is 129 ft (39.3 m) long and 74 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Manzanita Ave over Lindo Channel built?
It was built in 1968, making it 57 years old in 2025. It was reconstructed in 2009.
What condition is Manzanita Ave over Lindo Channel in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Manzanita Ave over Lindo Channel carry?
About 11,900 vehicles per day (2018 count), of which roughly 5% are trucks.
How long is Manzanita Ave over Lindo Channel?
The structure is 129 ft (39.3 m) long with a longest span of 28 ft (8.6 m) and a deck 74 ft wide.
Who owns Manzanita Ave over Lindo Channel?
It is owned by the City or Municipal Highway Agency.