Midway Road over UP RR & AMTRAK
FairButte County, California · 1.2MI No Dayton-Durham Hy · Structure no. 12C0255
- Built
- 1975
- 50 years old
- Condition
- Fair
- inspected May 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 236 ft
- 3 main spans
- Daily traffic
- 5,636
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
Midway Road over UP RR & AMTRAK is a prestressed concrete continuous box beam or girders - multiple carrying Midway Road over UP RR & AMTRAK in Butte County, California. It was built in 1975, so it is 50 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,636 vehicles a day, roughly 16% of them trucks, projected to reach 5,056 by 2046. The structure is 236 ft (71.9 m) long and 42 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Midway Road over UP RR & AMTRAK built?
It was built in 1975, making it 50 years old in 2025.
What condition is Midway Road over UP RR & AMTRAK in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does Midway Road over UP RR & AMTRAK carry?
About 5,636 vehicles per day (2019 count), of which roughly 16% are trucks.
How long is Midway Road over UP RR & AMTRAK?
The structure is 236 ft (71.9 m) long with a longest span of 108 ft (33 m) and a deck 42 ft wide.
Who owns Midway Road over UP RR & AMTRAK?
It is owned by the County Highway Agency.