Stilson Canyon RD over Little Chico Creek
FairButte County, California · 1.5 MI E Humboldt RD · Structure no. 12C0193
- Built
- 1906
- 119 years old, rebuilt 1945
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 47 ft
- 1 main span
- Daily traffic
- 613
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
Stilson Canyon RD over Little Chico Creek is a steel stringer/multi-beam or girder carrying Stilson Canyon RD over Little Chico Creek in Butte County, California. It was built in 1906 and reconstructed in 1945, so it is 119 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 613 vehicles a day, roughly 11% of them trucks, projected to reach 940 by 2042. The structure is 47 ft (14.2 m) long and 14 ft wide. If it were closed, the detour would be 11.2 mi (18 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Stilson Canyon RD over Little Chico Creek built?
It was built in 1906, making it 119 years old in 2025. It was reconstructed in 1945.
What condition is Stilson Canyon RD over Little Chico Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Stilson Canyon RD over Little Chico Creek carry?
About 613 vehicles per day (2019 count), of which roughly 11% are trucks.
How long is Stilson Canyon RD over Little Chico Creek?
The structure is 47 ft (14.2 m) long with a longest span of 45 ft (13.6 m) and a deck 14 ft wide.
Who owns Stilson Canyon RD over Little Chico Creek?
It is owned by the County Highway Agency.