Nord Gianella RD over Serenity Ditch
FairPosted for loadButte County, California · 1.6 MI W Folsom Street · Structure no. 12C0191
- Built
- 1941
- 84 years old
- Condition
- Fair
- inspected July 2024
- Type
- Girder and Floorbeam System
- Steel
- Length
- 63 ft
- 1 main span
- Daily traffic
- 100
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
Nord Gianella RD over Serenity Ditch is a steel girder and floorbeam system carrying Nord Gianella RD over Serenity Ditch in Butte County, California. It was built in 1941, so it is 84 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for other load-capacity restriction.
It carries about 100 vehicles a day, roughly 14% of them trucks, projected to reach 312 by 2043. The structure is 63 ft (19.1 m) long and 22 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Nord Gianella RD over Serenity Ditch built?
It was built in 1941, making it 84 years old in 2025.
What condition is Nord Gianella RD over Serenity Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Nord Gianella RD over Serenity Ditch carry?
About 100 vehicles per day (2019 count), of which roughly 14% are trucks.
How long is Nord Gianella RD over Serenity Ditch?
The structure is 63 ft (19.1 m) long with a longest span of 30 ft (9.2 m) and a deck 22 ft wide.
Who owns Nord Gianella RD over Serenity Ditch?
It is owned by the County Highway Agency.