W Evans-Reimer RD over Spencer Lateral
FairButte County, California · 0.25 MI W of Block RD · Structure no. 12C0131
- Built
- 1963
- 62 years old
- Condition
- Fair
- inspected March 2025
- Type
- Slab
- Concrete
- Length
- 28 ft
- 1 main span
- Daily traffic
- 376
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
W Evans-Reimer RD over Spencer Lateral is a concrete slab carrying W Evans-Reimer RD over Spencer Lateral in Butte County, California. It was built in 1963, so it is 62 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 376 vehicles a day, roughly 27% of them trucks, projected to reach 163 by 2047. The structure is 28 ft (8.5 m) long and 29 ft wide. If it were closed, the detour would be 11.8 mi (19 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was W Evans-Reimer RD over Spencer Lateral built?
It was built in 1963, making it 62 years old in 2025.
What condition is W Evans-Reimer RD over Spencer Lateral in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2025.
How much traffic does W Evans-Reimer RD over Spencer Lateral carry?
About 376 vehicles per day (2019 count), of which roughly 27% are trucks.
How long is W Evans-Reimer RD over Spencer Lateral?
The structure is 28 ft (8.5 m) long with a longest span of 28 ft (8.5 m) and a deck 29 ft wide.
Who owns W Evans-Reimer RD over Spencer Lateral?
It is owned by the County Highway Agency.