Midway Road over Comanche Creek
FairButte County, California · 0.1 MI S Park Ave · Structure no. 12C0056
- Built
- 1952
- 73 years old, rebuilt 1998
- Condition
- Fair
- inspected October 2024
- Type
- Slab
- Concrete Continuous
- Length
- 108 ft
- 4 main spans
- Daily traffic
- 16,900
- 2018 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Midway Road over Comanche Creek is a concrete continuous slab carrying Midway Road over Comanche Creek in Butte County, California. It was built in 1952 and reconstructed in 1998, so it is 73 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 16,900 vehicles a day, roughly 12% of them trucks, projected to reach 20,884 by 2042. The structure is 108 ft (33 m) long and 54 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Midway Road over Comanche Creek built?
It was built in 1952, making it 73 years old in 2025. It was reconstructed in 1998.
What condition is Midway Road over Comanche Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Midway Road over Comanche Creek carry?
About 16,900 vehicles per day (2018 count), of which roughly 12% are trucks.
How long is Midway Road over Comanche Creek?
The structure is 108 ft (33 m) long with a longest span of 30 ft (9.2 m) and a deck 54 ft wide.
Who owns Midway Road over Comanche Creek?
It is owned by the City or Municipal Highway Agency.