US Bridges

Road 23N28 over Chino Creek

FairClosed to traffic

Butte County, California · No Data Entered · Structure no. 051154000001084

Built
1981
44 years old, rebuilt 2000
Condition
Fair
inspected September 2024
Type
Stringer/Multi-beam or Girder
Wood or Timber
Length
40 ft
1 main span
Daily traffic
50
Owner
Federal
U.S. Forest Service

About this bridge

Road 23N28 over Chino Creek is a wood or timber stringer/multi-beam or girder carrying Road 23N28 over Chino Creek in Butte County, California. It was built in 1981 and reconstructed in 2000, so it is 44 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: closed to all traffic.

It carries about 50 vehicles a day, projected to reach 75 by 2045. The structure is 40 ft (12.2 m) long and 16 ft wide. If it were closed, the detour would be 620.7 mi (999 km).

CarriesRoad 23N28
CrossesChino Creek
LocationNo Data Entered
RouteFederal Lands Road 23N28
Coordinates39.73354, -121.40374
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusClosed to all traffic
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating35.1 US tons
Inventory rating27.1 US tons

Structure

MaterialWood or Timber
DeckWood or timber
Main spans1
Design loadUnknown
Structure length40 ft (12.2 m)
Longest span39 ft (11.9 m)
Deck width16 ft (4.8 m)
Roadway width14 ft (4.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (—)
Projected traffic75 by 2045
Trucks—
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed620.7 mi (999 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Road 23N28 over Chino Creek built?

It was built in 1981, making it 44 years old in 2025. It was reconstructed in 2000.

What condition is Road 23N28 over Chino Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does Road 23N28 over Chino Creek carry?

About 50 vehicles per day (latest count).

How long is Road 23N28 over Chino Creek?

The structure is 40 ft (12.2 m) long with a longest span of 39 ft (11.9 m) and a deck 16 ft wide.

Who owns Road 23N28 over Chino Creek?

It is owned by the U.S. Forest Service.