Tyler Road over South Fork Cosumnes Riv
FairAmador County, California · 3.0 MI NE of Lawrence RD · Structure no. 26C0029
- Built
- 1945
- 80 years old, rebuilt 2021
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 23 ft
- 1 main span
- Daily traffic
- 56
- 2014 count
- Owner
- County
- County Highway Agency
About this bridge
Tyler Road over South Fork Cosumnes Riv is a wood or timber stringer/multi-beam or girder carrying Tyler Road over South Fork Cosumnes Riv in Amador County, California. It was built in 1945 and reconstructed in 2021, so it is 80 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 56 vehicles a day, projected to reach 114 by 2042. The structure is 23 ft (7 m) long and 17 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Tyler Road over South Fork Cosumnes Riv built?
It was built in 1945, making it 80 years old in 2025. It was reconstructed in 2021.
What condition is Tyler Road over South Fork Cosumnes Riv in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Tyler Road over South Fork Cosumnes Riv carry?
About 56 vehicles per day (2014 count).
How long is Tyler Road over South Fork Cosumnes Riv?
The structure is 23 ft (7 m) long with a longest span of 21 ft (6.4 m) and a deck 17 ft wide.
Who owns Tyler Road over South Fork Cosumnes Riv?
It is owned by the County Highway Agency.