Dublin Blvd (wb) over Tassajara Creek
FairAlameda County, California · West of John Monego Ct · Structure no. 33C0431L
- Built
- 1999
- 26 years old
- Condition
- Fair
- inspected October 2023
- Type
- Slab
- Concrete Continuous
- Length
- 120 ft
- 3 main spans
- Daily traffic
- 10,000
- 2014 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Dublin Blvd (wb) over Tassajara Creek is a concrete continuous slab carrying Dublin Blvd (wb) over Tassajara Creek in Alameda County, California. It was built in 1999, so it is 26 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10,000 vehicles a day, roughly 3% of them trucks, projected to reach 11,641 by 2043. The structure is 120 ft (36.6 m) long and 55 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Dublin Blvd (wb) over Tassajara Creek built?
It was built in 1999, making it 26 years old in 2025.
What condition is Dublin Blvd (wb) over Tassajara Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does Dublin Blvd (wb) over Tassajara Creek carry?
About 10,000 vehicles per day (2014 count), of which roughly 3% are trucks.
How long is Dublin Blvd (wb) over Tassajara Creek?
The structure is 120 ft (36.6 m) long with a longest span of 40 ft (12.2 m) and a deck 55 ft wide.
Who owns Dublin Blvd (wb) over Tassajara Creek?
It is owned by the City or Municipal Highway Agency.