US Bridges

Ballena Blvd over Ballena Bay

Fair

Alameda County, California · 0.1 MI S of Central Ave · Structure no. 33C0230

Built
1966
59 years old
Condition
Fair
inspected November 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
144 ft
3 main spans
Daily traffic
1,621
2011 count
Owner
City
City or Municipal Highway Agency

About this bridge

Ballena Blvd over Ballena Bay is a prestressed concrete stringer/multi-beam or girder carrying Ballena Blvd over Ballena Bay in Alameda County, California. It was built in 1966, so it is 59 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,621 vehicles a day, roughly 2% of them trucks, projected to reach 6,018 by 2042. The structure is 144 ft (43.9 m) long and 59 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesBallena Blvd
CrossesBallena Bay
Location0.1 MI S of Central Ave
RouteCity Street 0
Coordinates37.76958, -122.28606
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure8 Very GoodNo problems noted.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment3: Basically intolerable, requiring high priority of corrective action
Operating rating46.7 US tons
Inventory rating27.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length144 ft (43.9 m)
Longest span61 ft (18.6 m)
Deck width59 ft (18 m)
Roadway width51 ft (15.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,621 (2011)
Projected traffic6,018 by 2042
Trucks2%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Ballena Blvd over Ballena Bay built?

It was built in 1966, making it 59 years old in 2025.

What condition is Ballena Blvd over Ballena Bay in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does Ballena Blvd over Ballena Bay carry?

About 1,621 vehicles per day (2011 count), of which roughly 2% are trucks.

How long is Ballena Blvd over Ballena Bay?

The structure is 144 ft (43.9 m) long with a longest span of 61 ft (18.6 m) and a deck 59 ft wide.

Who owns Ballena Blvd over Ballena Bay?

It is owned by the City or Municipal Highway Agency.