San Leandro Blvd over San Leandro Creek
GoodAlameda County, California · 0.2 MI North of Davis ST · Structure no. 33C0080
- Built
- 1931
- 94 years old
- Condition
- Good
- inspected September 2024
- Type
- Tee Beam
- Concrete Continuous
- Length
- 80 ft
- 2 main spans
- Daily traffic
- 16,100
- 2016 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
San Leandro Blvd over San Leandro Creek is a concrete continuous tee beam carrying San Leandro Blvd over San Leandro Creek in Alameda County, California. It was built in 1931, so it is 94 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 16,100 vehicles a day, roughly 15% of them trucks, projected to reach 27,810 by 2042. The structure is 80 ft (24.4 m) long and 80 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was San Leandro Blvd over San Leandro Creek built?
It was built in 1931, making it 94 years old in 2025.
What condition is San Leandro Blvd over San Leandro Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does San Leandro Blvd over San Leandro Creek carry?
About 16,100 vehicles per day (2016 count), of which roughly 15% are trucks.
How long is San Leandro Blvd over San Leandro Creek?
The structure is 80 ft (24.4 m) long with a longest span of 39 ft (12 m) and a deck 80 ft wide.
Who owns San Leandro Blvd over San Leandro Creek?
It is owned by the City or Municipal Highway Agency.