I880 NB over UPRR AMTRAK SR77 High
FairAlameda County, California · 04-ALA-880-27.63-OAK · Structure no. 33 0732R
- Built
- 2013
- 12 years old
- Condition
- Fair
- inspected January 2025
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete Continuous
- Length
- 1,722 ft
- 12 main spans
- Daily traffic
- 110,500
- 2009 count
- Owner
- State
- State Highway Agency
About this bridge
I880 NB over UPRR AMTRAK SR77 High is a prestressed concrete continuous box beam or girders - single or spread carrying I880 NB over UPRR AMTRAK SR77 High in Alameda County, California. It was built in 2013, so it is 12 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 110,500 vehicles a day, roughly 11% of them trucks, projected to reach 148,722 by 2043. The structure is 1,722 ft (525 m) long and 84 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I880 NB over UPRR AMTRAK SR77 High built?
It was built in 2013, making it 12 years old in 2025.
What condition is I880 NB over UPRR AMTRAK SR77 High in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does I880 NB over UPRR AMTRAK SR77 High carry?
About 110,500 vehicles per day (2009 count), of which roughly 11% are trucks.
How long is I880 NB over UPRR AMTRAK SR77 High?
The structure is 1,722 ft (525 m) long with a longest span of 174 ft (53.1 m) and a deck 84 ft wide.
Who owns I880 NB over UPRR AMTRAK SR77 High?
It is owned by the State Highway Agency.