Hopyard Dougherty over Interstate 580
GoodAlameda County, California · 04-ALA-580-19.86-PLE · Structure no. 33 0551
- Built
- 1988
- 37 years old, rebuilt 1994
- Condition
- Good
- inspected February 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 444 ft
- 2 main spans
- Daily traffic
- 6,000
- 1998 count
- Owner
- State
- State Highway Agency
About this bridge
Hopyard Dougherty over Interstate 580 is a prestressed concrete continuous box beam or girders - multiple carrying Hopyard Dougherty over Interstate 580 in Alameda County, California. It was built in 1988 and reconstructed in 1994, so it is 37 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 6,000 vehicles a day, roughly 5% of them trucks, projected to reach 12,035 by 2042. The structure is 444 ft (135.3 m) long and 121 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Hopyard Dougherty over Interstate 580 built?
It was built in 1988, making it 37 years old in 2025. It was reconstructed in 1994.
What condition is Hopyard Dougherty over Interstate 580 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does Hopyard Dougherty over Interstate 580 carry?
About 6,000 vehicles per day (1998 count), of which roughly 5% are trucks.
How long is Hopyard Dougherty over Interstate 580?
The structure is 444 ft (135.3 m) long with a longest span of 244 ft (74.4 m) and a deck 121 ft wide.
Who owns Hopyard Dougherty over Interstate 580?
It is owned by the State Highway Agency.