S980-S880 Connecto over 5th I880 6th 7th Mlk Jef
FairAlameda County, California · 04-ALA-980-0.02-OAK · Structure no. 33 0483F
- Built
- 1985
- 40 years old, rebuilt 1990
- Condition
- Fair
- inspected May 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 1,808 ft
- 10 main spans
- Daily traffic
- 67,500
- 2012 count
- Owner
- State
- State Highway Agency
About this bridge
S980-S880 Connecto over 5th I880 6th 7th Mlk Jef is a prestressed concrete continuous box beam or girders - multiple carrying S980-S880 Connecto over 5th I880 6th 7th Mlk Jef in Alameda County, California. It was built in 1985 and reconstructed in 1990, so it is 40 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 67,500 vehicles a day, roughly 2% of them trucks, projected to reach 87,644 by 2044. The structure is 1,808 ft (551.1 m) long and 54 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S980-S880 Connecto over 5th I880 6th 7th Mlk Jef built?
It was built in 1985, making it 40 years old in 2025. It was reconstructed in 1990.
What condition is S980-S880 Connecto over 5th I880 6th 7th Mlk Jef in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does S980-S880 Connecto over 5th I880 6th 7th Mlk Jef carry?
About 67,500 vehicles per day (2012 count), of which roughly 2% are trucks.
How long is S980-S880 Connecto over 5th I880 6th 7th Mlk Jef?
The structure is 1,808 ft (551.1 m) long with a longest span of 131 ft (39.9 m) and a deck 54 ft wide.
Who owns S980-S880 Connecto over 5th I880 6th 7th Mlk Jef?
It is owned by the State Highway Agency.