US Bridges

CO 1st Street N over Drainage Channel (dry)

Good

Yuma County, Arizona · 3.0 Ml E JCT Ave 52E · Structure no. 11575

Built
2018
7 years old
Condition
Good
inspected January 2025
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
41 ft
1 main span
Daily traffic
60
2022 count
Owner
County
County Highway Agency

About this bridge

CO 1st Street N over Drainage Channel (dry) is a prestressed concrete box beam or girders - multiple carrying CO 1st Street N over Drainage Channel (dry) in Yuma County, Arizona. It was built in 2018, so it is 7 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 60 vehicles a day, roughly 5% of them trucks, projected to reach 70 by 2042. The structure is 41 ft (12.5 m) long and 48 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesCO 1st Street N
CrossesDrainage Channel (dry)
Location3.0 Ml E JCT Ave 52E
RouteCounty Highway 0
StateArizona
Coordinates32.8253, -113.69675
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating47 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length41 ft (12.5 m)
Longest span38 ft (11.6 m)
Deck width48 ft (14.6 m)
Roadway width45 ft (13.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic60 (2022)
Projected traffic70 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CO 1st Street N over Drainage Channel (dry) built?

It was built in 2018, making it 7 years old in 2025.

What condition is CO 1st Street N over Drainage Channel (dry) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does CO 1st Street N over Drainage Channel (dry) carry?

About 60 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is CO 1st Street N over Drainage Channel (dry)?

The structure is 41 ft (12.5 m) long with a longest span of 38 ft (11.6 m) and a deck 48 ft wide.

Who owns CO 1st Street N over Drainage Channel (dry)?

It is owned by the County Highway Agency.