US Bridges

32nd Street over East Main Canal

Good

Yuma County, Arizona · 0.5 MI E JCT Avenue B · Structure no. 11115

Built
2009
16 years old
Condition
Good
inspected March 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
80 ft
1 main span
Daily traffic
—
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

32nd Street over East Main Canal is a prestressed concrete box beam or girders - multiple carrying 32nd Street over East Main Canal in Yuma County, Arizona. It was built in 2009, so it is 16 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: new structure not yet open to traffic.

No traffic count is recorded. The structure is 80 ft (24.4 m) long and 60 ft wide.

Carries32nd Street
CrossesEast Main Canal
Location0.5 MI E JCT Avenue B
RouteCity Street 0
StateArizona
Coordinates32.66969, -114.64097
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusNew structure not yet open to traffic
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating93 US tons
Inventory rating56 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length80 ft (24.4 m)
Longest span77 ft (23.5 m)
Deck width60 ft (18.3 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deck25 ft (7.6 m)

Traffic and service

Average daily traffic—
Projected traffic10 by 2042
Trucks0%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 32nd Street over East Main Canal built?

It was built in 2009, making it 16 years old in 2025.

What condition is 32nd Street over East Main Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does 32nd Street over East Main Canal carry?

No traffic count is recorded for this structure.

How long is 32nd Street over East Main Canal?

The structure is 80 ft (24.4 m) long with a longest span of 77 ft (23.5 m) and a deck 60 ft wide.

Who owns 32nd Street over East Main Canal?

It is owned by the City or Municipal Highway Agency.