Main Street over Main Drain
GoodYuma County, Arizona · 0.4 MI N JCT Juan Sanchez · Structure no. 11072
- Built
- 1999
- 26 years old
- Condition
- Good
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 96 ft
- 1 main span
- Daily traffic
- 24,767
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Main Street over Main Drain is a prestressed concrete stringer/multi-beam or girder carrying Main Street over Main Drain in Yuma County, Arizona. It was built in 1999, so it is 26 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 24,767 vehicles a day, roughly 9% of them trucks, projected to reach 24,777 by 2042. The structure is 96 ft (29.3 m) long and 81 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Main Street over Main Drain built?
It was built in 1999, making it 26 years old in 2025.
What condition is Main Street over Main Drain in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.
How much traffic does Main Street over Main Drain carry?
About 24,767 vehicles per day (2023 count), of which roughly 9% are trucks.
How long is Main Street over Main Drain?
The structure is 96 ft (29.3 m) long with a longest span of 87 ft (26.5 m) and a deck 81 ft wide.
Who owns Main Street over Main Drain?
It is owned by the City or Municipal Highway Agency.