Avenue 21E Roadway over Wellton Mohawk Main C Ch
GoodYuma County, Arizona · 0.5 MI N JCT CO 8th ST · Structure no. 10548
- Built
- 2008
- 17 years old
- Condition
- Good
- inspected March 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 50 ft
- 1 main span
- Daily traffic
- 90
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Avenue 21E Roadway over Wellton Mohawk Main C Ch is a prestressed concrete box beam or girders - multiple carrying Avenue 21E Roadway over Wellton Mohawk Main C Ch in Yuma County, Arizona. It was built in 2008, so it is 17 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 90 vehicles a day, roughly 1% of them trucks, projected to reach 100 by 2042. The structure is 50 ft (15.2 m) long and 36 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Avenue 21E Roadway over Wellton Mohawk Main C Ch built?
It was built in 2008, making it 17 years old in 2025.
What condition is Avenue 21E Roadway over Wellton Mohawk Main C Ch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.
How much traffic does Avenue 21E Roadway over Wellton Mohawk Main C Ch carry?
About 90 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is Avenue 21E Roadway over Wellton Mohawk Main C Ch?
The structure is 50 ft (15.2 m) long with a longest span of 47 ft (14.3 m) and a deck 36 ft wide.
Who owns Avenue 21E Roadway over Wellton Mohawk Main C Ch?
It is owned by the County Highway Agency.