US Bridges

US 95 over Wellton Mohawk Canal

Good

Yuma County, Arizona · 13.8 MI N JCT I-8 · Structure no. 02881

Built
2025
0 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Concrete
Length
107 ft
1 main span
Daily traffic
8,278
2024 count
Owner
State
State Highway Agency

About this bridge

US 95 over Wellton Mohawk Canal is a concrete stringer/multi-beam or girder carrying US 95 over Wellton Mohawk Canal in Yuma County, Arizona. It was built in 2025, so it is 0 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,278 vehicles a day, roughly 15% of them trucks, projected to reach 8,288 by 2042. The structure is 107 ft (32.6 m) long and 83 ft wide. If it were closed, the detour would be 28 mi (45 km).

CarriesUS 95
CrossesWellton Mohawk Canal
Location13.8 MI N JCT I-8
RouteU.S. Route 0
StateArizona
Coordinates32.7515, -114.4217
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating47 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length107 ft (32.6 m)
Longest span103 ft (31.4 m)
Deck width83 ft (25.2 m)
Roadway width80 ft (24.4 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic8,278 (2024)
Projected traffic8,288 by 2042
Trucks15%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed28 mi (45 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 95 over Wellton Mohawk Canal built?

It was built in 2025, making it 0 years old in 2025.

What condition is US 95 over Wellton Mohawk Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does US 95 over Wellton Mohawk Canal carry?

About 8,278 vehicles per day (2024 count), of which roughly 15% are trucks.

How long is US 95 over Wellton Mohawk Canal?

The structure is 107 ft (32.6 m) long with a longest span of 103 ft (31.4 m) and a deck 83 ft wide.

Who owns US 95 over Wellton Mohawk Canal?

It is owned by the State Highway Agency.