US Bridges

Kirkland Road over Desert Wash

Good

Yavapai County, Arizona · 2.1 MI NW JCT SR 89 · Structure no. 09463

Built
1947
78 years old
Condition
Good
inspected October 2023
Type
Culvert
Concrete Continuous
Length
32 ft
3 main spans
Daily traffic
1,040
2021 count
Owner
County
County Highway Agency

About this bridge

Kirkland Road over Desert Wash is a concrete continuous culvert carrying Kirkland Road over Desert Wash in Yavapai County, Arizona. It was built in 1947, so it is 78 years old, older than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,040 vehicles a day, roughly 5% of them trucks, projected to reach 1,050 by 2041. The structure is 32 ft (9.8 m) long and 35 ft wide. If it were closed, the detour would be 49.7 mi (80 km).

CarriesKirkland Road
CrossesDesert Wash
Location2.1 MI NW JCT SR 89
RouteCounty Highway 0
StateArizona
Coordinates34.39119, -112.68719
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating58 US tons
Inventory rating35.1 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length32 ft (9.8 m)
Longest span10 ft (3 m)
Deck width35 ft (10.7 m)
Roadway width33 ft (10.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,040 (2021)
Projected traffic1,050 by 2041
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed49.7 mi (80 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Kirkland Road over Desert Wash built?

It was built in 1947, making it 78 years old in 2025.

What condition is Kirkland Road over Desert Wash in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Kirkland Road over Desert Wash carry?

About 1,040 vehicles per day (2021 count), of which roughly 5% are trucks.

How long is Kirkland Road over Desert Wash?

The structure is 32 ft (9.8 m) long with a longest span of 10 ft (3 m) and a deck 35 ft wide.

Who owns Kirkland Road over Desert Wash?

It is owned by the County Highway Agency.