Ajo Way Ramp a over Irvington RD Ramp C
GoodPima County, Arizona · 0.08 MI S of Ajo Way · Structure no. 20058
- Built
- 2017
- 8 years old
- Condition
- Good
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 325 ft
- 4 main spans
- Daily traffic
- 4,640
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
Ajo Way Ramp a over Irvington RD Ramp C is a prestressed concrete continuous stringer/multi-beam or girder carrying Ajo Way Ramp a over Irvington RD Ramp C in Pima County, Arizona. It was built in 2017, so it is 8 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,640 vehicles a day, roughly 19% of them trucks, projected to reach 4,650 by 2041. The structure is 325 ft (99.1 m) long and 35 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ajo Way Ramp a over Irvington RD Ramp C built?
It was built in 2017, making it 8 years old in 2025.
What condition is Ajo Way Ramp a over Irvington RD Ramp C in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does Ajo Way Ramp a over Irvington RD Ramp C carry?
About 4,640 vehicles per day (2021 count), of which roughly 19% are trucks.
How long is Ajo Way Ramp a over Irvington RD Ramp C?
The structure is 325 ft (99.1 m) long with a longest span of 100 ft (30.5 m) and a deck 35 ft wide.
Who owns Ajo Way Ramp a over Irvington RD Ramp C?
It is owned by the State Highway Agency.