US Bridges

Camino Del Toro RD over Medium Wash

Good

Pima County, Arizona · W of Willis Ave · Structure no. 11581

Built
2006
19 years old
Condition
Good
inspected October 2023
Type
Culvert
Steel
Length
53 ft
5 main spans
Daily traffic
2,558
2022 count
Owner
County
County Highway Agency

About this bridge

Camino Del Toro RD over Medium Wash is a steel culvert carrying Camino Del Toro RD over Medium Wash in Pima County, Arizona. It was built in 2006, so it is 19 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,558 vehicles a day, roughly 5% of them trucks, projected to reach 2,568 by 2042. The structure is 53 ft (16.2 m) long. If it were closed, the detour would be 3.1 mi (5 km).

CarriesCamino Del Toro RD
CrossesMedium Wash
LocationW of Willis Ave
RouteCounty Highway 0
StateArizona
Coordinates31.94864, -110.78714
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection9 ExcellentNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54.2 US tons
Inventory rating41.8 US tons

Structure

Structure typeCulvert
MaterialSteel
DeckNot applicable
Main spans5
Design loadHS 20
Structure length53 ft (16.2 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,558 (2022)
Projected traffic2,568 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Camino Del Toro RD over Medium Wash built?

It was built in 2006, making it 19 years old in 2025.

What condition is Camino Del Toro RD over Medium Wash in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Camino Del Toro RD over Medium Wash carry?

About 2,558 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is Camino Del Toro RD over Medium Wash?

The structure is 53 ft (16.2 m) long with a longest span of 10 ft (3 m).

Who owns Camino Del Toro RD over Medium Wash?

It is owned by the County Highway Agency.