LA Cholla Blvd SB over Canada Del Oro Wash
GoodPima County, Arizona · 0.3 MI S of Overton RD · Structure no. 11323
- Built
- 2014
- 11 years old
- Condition
- Good
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 607 ft
- 6 main spans
- Daily traffic
- 7,011
- 2025 count
- Owner
- County
- County Highway Agency
About this bridge
LA Cholla Blvd SB over Canada Del Oro Wash is a prestressed concrete continuous stringer/multi-beam or girder carrying LA Cholla Blvd SB over Canada Del Oro Wash in Pima County, Arizona. It was built in 2014, so it is 11 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 7,011 vehicles a day, roughly 5% of them trucks, projected to reach 7,021 by 2042. The structure is 607 ft (185 m) long and 42 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was LA Cholla Blvd SB over Canada Del Oro Wash built?
It was built in 2014, making it 11 years old in 2025.
What condition is LA Cholla Blvd SB over Canada Del Oro Wash in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.
How much traffic does LA Cholla Blvd SB over Canada Del Oro Wash carry?
About 7,011 vehicles per day (2025 count), of which roughly 5% are trucks.
How long is LA Cholla Blvd SB over Canada Del Oro Wash?
The structure is 607 ft (185 m) long with a longest span of 100 ft (30.5 m) and a deck 42 ft wide.
Who owns LA Cholla Blvd SB over Canada Del Oro Wash?
It is owned by the County Highway Agency.