US Bridges

Park Access RD over Julian Wash

Good

Pima County, Arizona · Littletown Park · Structure no. 11310

Built
2013
12 years old
Condition
Good
inspected July 2023
Type
Truss - Thru
Steel
Length
94 ft
1 main span
Daily traffic
100
2023 count
Owner
County
County Highway Agency

About this bridge

Park Access RD over Julian Wash is a steel truss - thru carrying Park Access RD over Julian Wash in Pima County, Arizona. It was built in 2013, so it is 12 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, projected to reach 110 by 2042. The structure is 94 ft (28.7 m) long and 35 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPark Access RD
CrossesJulian Wash
LocationLittletown Park
RouteCounty Highway 0
StateArizona
Coordinates32.13625, -110.87472
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating41.8 US tons
Inventory rating32.5 US tons

Structure

Structure typeTruss - Thru
MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length94 ft (28.7 m)
Longest span90 ft (27.4 m)
Deck width35 ft (10.6 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2023)
Projected traffic110 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Park Access RD over Julian Wash built?

It was built in 2013, making it 12 years old in 2025.

What condition is Park Access RD over Julian Wash in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Park Access RD over Julian Wash carry?

About 100 vehicles per day (2023 count).

How long is Park Access RD over Julian Wash?

The structure is 94 ft (28.7 m) long with a longest span of 90 ft (27.4 m) and a deck 35 ft wide.

Who owns Park Access RD over Julian Wash?

It is owned by the County Highway Agency.