US Bridges

Fairland Stravenue over Drainageway

Good

Pima County, Arizona · 0.5 MI W JCT Country Club · Structure no. 10299

Built
1988
37 years old
Condition
Good
inspected May 2023
Type
Culvert
Concrete Continuous
Length
39 ft
3 main spans
Daily traffic
3,196
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Fairland Stravenue over Drainageway is a concrete continuous culvert carrying Fairland Stravenue over Drainageway in Pima County, Arizona. It was built in 1988, so it is 37 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,196 vehicles a day, roughly 5% of them trucks, projected to reach 3,206 by 2042. The structure is 39 ft (11.9 m) long and 116 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesFairland Stravenue
CrossesDrainageway
Location0.5 MI W JCT Country Club
RouteCity Street 0
StateArizona
Coordinates32.1967, -110.9334
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59 US tons
Inventory rating35.1 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length39 ft (11.9 m)
Longest span10 ft (3 m)
Deck width116 ft (35.4 m)
Roadway width64 ft (19.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,196 (2023)
Projected traffic3,206 by 2042
Trucks5%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Fairland Stravenue over Drainageway built?

It was built in 1988, making it 37 years old in 2025.

What condition is Fairland Stravenue over Drainageway in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Fairland Stravenue over Drainageway carry?

About 3,196 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is Fairland Stravenue over Drainageway?

The structure is 39 ft (11.9 m) long with a longest span of 10 ft (3 m) and a deck 116 ft wide.

Who owns Fairland Stravenue over Drainageway?

It is owned by the City or Municipal Highway Agency.