US Bridges

Greenlee Road over Drainageway

Good

Pima County, Arizona · 0.2 MI E JCT Columbus Bl · Structure no. 10289

Built
1988
37 years old
Condition
Good
inspected March 2023
Type
Culvert
Concrete Continuous
Length
43 ft
4 main spans
Daily traffic
100
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Greenlee Road over Drainageway is a concrete continuous culvert carrying Greenlee Road over Drainageway in Pima County, Arizona. It was built in 1988, so it is 37 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, projected to reach 110 by 2042. The structure is 43 ft (13.1 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesGreenlee Road
CrossesDrainageway
Location0.2 MI E JCT Columbus Bl
RouteCity Street 0
StateArizona
Coordinates32.2712, -110.8975
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating70 US tons
Inventory rating42 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans4
Design loadHS 20
Structure length43 ft (13.1 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2022)
Projected traffic110 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Greenlee Road over Drainageway built?

It was built in 1988, making it 37 years old in 2025.

What condition is Greenlee Road over Drainageway in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Greenlee Road over Drainageway carry?

About 100 vehicles per day (2022 count).

How long is Greenlee Road over Drainageway?

The structure is 43 ft (13.1 m) long with a longest span of 10 ft (3 m).

Who owns Greenlee Road over Drainageway?

It is owned by the City or Municipal Highway Agency.