North Alvernon Way over Diversion Channel
GoodPima County, Arizona · N.Alvernon Way and Div Ch · Structure no. 09810
- Built
- 1984
- 41 years old
- Condition
- Good
- inspected January 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 103 ft
- 1 main span
- Daily traffic
- 8,752
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
North Alvernon Way over Diversion Channel is a prestressed concrete box beam or girders - multiple carrying North Alvernon Way over Diversion Channel in Pima County, Arizona. It was built in 1984, so it is 41 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 8,752 vehicles a day, roughly 5% of them trucks, projected to reach 8,762 by 2042. The structure is 103 ft (31.4 m) long and 31 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was North Alvernon Way over Diversion Channel built?
It was built in 1984, making it 41 years old in 2025.
What condition is North Alvernon Way over Diversion Channel in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.
How much traffic does North Alvernon Way over Diversion Channel carry?
About 8,752 vehicles per day (2022 count), of which roughly 5% are trucks.
How long is North Alvernon Way over Diversion Channel?
The structure is 103 ft (31.4 m) long with a longest span of 100 ft (30.5 m) and a deck 31 ft wide.
Who owns North Alvernon Way over Diversion Channel?
It is owned by the County Highway Agency.