US Bridges

Pantano Road over Sherwood Vlg Wash

Good

Pima County, Arizona · 0.1 MI S Broadway RD · Structure no. 09614

Built
1978
47 years old
Condition
Good
inspected October 2021
Type
Culvert
Concrete Continuous
Length
32 ft
3 main spans
Daily traffic
18,236
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Pantano Road over Sherwood Vlg Wash is a concrete continuous culvert carrying Pantano Road over Sherwood Vlg Wash in Pima County, Arizona. It was built in 1978, so it is 47 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 18,236 vehicles a day, roughly 10% of them trucks, projected to reach 18,246 by 2040. The structure is 32 ft (9.8 m) long and 90 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesPantano Road
CrossesSherwood Vlg Wash
Location0.1 MI S Broadway RD
RouteCity Street 0
StateArizona
Coordinates32.219, -110.8239
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionOctober 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length32 ft (9.8 m)
Longest span10 ft (3 m)
Deck width90 ft (27.4 m)
Roadway width72 ft (21.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,236 (2020)
Projected traffic18,246 by 2040
Trucks10%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Pantano Road over Sherwood Vlg Wash built?

It was built in 1978, making it 47 years old in 2025.

What condition is Pantano Road over Sherwood Vlg Wash in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2021.

How much traffic does Pantano Road over Sherwood Vlg Wash carry?

About 18,236 vehicles per day (2020 count), of which roughly 10% are trucks.

How long is Pantano Road over Sherwood Vlg Wash?

The structure is 32 ft (9.8 m) long with a longest span of 10 ft (3 m) and a deck 90 ft wide.

Who owns Pantano Road over Sherwood Vlg Wash?

It is owned by the City or Municipal Highway Agency.