US Bridges

Prince RD over I-10

Good

Pima County, Arizona · 0.9 MI N JCT SR 77 · Structure no. 02895

Built
2013
12 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
229 ft
2 main spans
Daily traffic
10,010
2024 count
Owner
State
State Highway Agency

About this bridge

Prince RD over I-10 is a prestressed concrete stringer/multi-beam or girder carrying Prince RD over I-10 in Pima County, Arizona. It was built in 2013, so it is 12 years old, younger than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,010 vehicles a day, roughly 10% of them trucks, projected to reach 10,020 by 2042. The structure is 229 ft (69.8 m) long and 124 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

Location

No coordinates are recorded for this structure.

CarriesPrince RD
CrossesI-10
Location0.9 MI N JCT SR 77
RouteCity Street 0
StateArizona
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating96 US tons
Inventory rating38 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length229 ft (69.8 m)
Longest span112 ft (34.1 m)
Deck width124 ft (37.9 m)
Roadway width102 ft (31.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,010 (2024)
Projected traffic10,020 by 2042
Trucks10%
Lanes on structure7
Traffic directionTwo-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Prince RD over I-10 built?

It was built in 2013, making it 12 years old in 2025.

What condition is Prince RD over I-10 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Prince RD over I-10 carry?

About 10,010 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is Prince RD over I-10?

The structure is 229 ft (69.8 m) long with a longest span of 112 ft (34.1 m) and a deck 124 ft wide.

Who owns Prince RD over I-10?

It is owned by the State Highway Agency.