US Bridges

IRR I 19; NB over Pima Mine RD

Good

Pima County, Arizona · 6.4 MI N JCT B 19 · Structure no. 01303

Built
1968
57 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
198 ft
4 main spans
Daily traffic
20,297
2021 count
Owner
State
State Highway Agency

About this bridge

IRR I 19; NB over Pima Mine RD is a prestressed concrete stringer/multi-beam or girder carrying IRR I 19; NB over Pima Mine RD in Pima County, Arizona. It was built in 1968, so it is 57 years old, older than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 20,297 vehicles a day, roughly 19% of them trucks, projected to reach 20,307 by 2041. The structure is 198 ft (60.4 m) long and 43 ft wide.

CarriesIRR I 19; NB
CrossesPima Mine RD
Location6.4 MI N JCT B 19
RouteInterstate 19
StateArizona
Coordinates32.001, -110.992
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating77.1 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length198 ft (60.4 m)
Longest span61 ft (18.6 m)
Deck width43 ft (13.2 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deck30 ft (9.1 m)

Traffic and service

Average daily traffic20,297 (2021)
Projected traffic20,307 by 2041
Trucks19%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway and railroad
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IRR I 19; NB over Pima Mine RD built?

It was built in 1968, making it 57 years old in 2025.

What condition is IRR I 19; NB over Pima Mine RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does IRR I 19; NB over Pima Mine RD carry?

About 20,297 vehicles per day (2021 count), of which roughly 19% are trucks.

How long is IRR I 19; NB over Pima Mine RD?

The structure is 198 ft (60.4 m) long with a longest span of 61 ft (18.6 m) and a deck 43 ft wide.

Who owns IRR I 19; NB over Pima Mine RD?

It is owned by the State Highway Agency.