IRR BIA RTE 161 over Wash
PoorPima County, Arizona · 2.7 KM South of Az HWY 86 · Structure no. 00000000000H661
- Built
- 1998
- 27 years old
- Condition
- Poor
- inspected January 2023
- Type
- Culvert
- Aluminum, Wrought Iron, or Cast Iron
- Length
- 39 ft
- 3 main spans
- Daily traffic
- 250
- 2023 count
- Owner
- Federal
- Bureau of Indian Affairs
About this bridge
IRR BIA RTE 161 over Wash is a aluminum, wrought iron, or cast iron culvert carrying IRR BIA RTE 161 over Wash in Pima County, Arizona. It was built in 1998, so it is 27 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: open, posting recommended but not legally implemented.
It carries about 250 vehicles a day, roughly 2% of them trucks, projected to reach 297 by 2043. The structure is 39 ft (11.9 m) long and 32 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IRR BIA RTE 161 over Wash built?
It was built in 1998, making it 27 years old in 2025.
What condition is IRR BIA RTE 161 over Wash in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in January 2023.
How much traffic does IRR BIA RTE 161 over Wash carry?
About 250 vehicles per day (2023 count), of which roughly 2% are trucks.
How long is IRR BIA RTE 161 over Wash?
The structure is 39 ft (11.9 m) long with a longest span of 13 ft (3.9 m) and a deck 32 ft wide.
Who owns IRR BIA RTE 161 over Wash?
It is owned by the Bureau of Indian Affairs.